Projects

Projects

New Deck

We wanted a deck and they wanted $8,000+. I thought “Every MAN should build his own deck” I was STUPID. Here’s the result of all my spare time for the last 2 months. I will have to add a step on the yard side when Lina finishes a patio area and some landscaping. I found […]

Projects

Kayak Rack

The Rack Store said this couldn’t be done when I tried to explain what I wanted…So I made it out of Black Pipe. There’s still a couple of modifications to make it more user-friendly and Lina has to paint it. Works like a charm.

Projects

Workbench Part II

As part of my ongoing effort to get away from the damn computer. Here is my latest woodworking project which is part 2 of my work bench.

Projects

New Kitchen Microwave. 2 hour installation turns into 3 days

  We bought a microwave for over the stove that turned into a disaster. The actual microwave installation took about 2 hours but the prep work to get ready for the microwave, install a couple of plugs and updating a couple of plugs turned into a weekend long project with many, many trips to Home

Projects

Workbench Part I

As part of my ongoing effort to get away from the damn computer. Here is my latest woodworking project which is part 1 of my work bench. Almost every part of is make from 3/4″ plywood and I thought that this could be the heaviest workbench ever. It’s probably close.

Projects

Chris Finally Finished the Garage

We had the garage built by professionals but left the inside unfinished so that I could do something that didn’t involve a computer. It’s been a real learning process with these tips that I can pass along: Specify the exact electrical service you want. The contractor installed a 15 A service that left our house

Projects

Woodworking Projects

Here’s my next two projects made from scrap wood after I finally tired of tripping over and hunting through all the scrap wood in the garage.

Projects

Aloo/Han Cholo/Tepehuan’s new doghouse

I finally finished my first woodworking project. Aloo/Han Cholo/Tepehuan is supposed to arrive tonight and he’ll have a fully insulated doghouse with a special heating pad inside for those days that I’m out of town and Lina has to work. We can’t decide what to name the poor little guy. Here are our options. Tepehuan

Scroll to Top